Solar plants inside AutoCAD, from terrain to construction drawings

It works on your own DWG: the plant that gets calculated is the plant that gets issued, and every number stays traceable to the model.

See what it does

What it does

01Terrain and layout

  • Terrain from 9 formats (TIN, DEM, contours and GIS) with OpenStreetMap obstacles
  • Strings on the real terrain: fixed tilt, single-axis trackers and TFT, with a 3D view
  • Near and far shading over the terrain
  • Weather from PVGIS, NASA, Open-Meteo, NSRDB and Solcast, with your own API key
  • Capacity optimizer: installed capacity against specific yield
Sector 1 on satellite imagerySAT-01
Sector 1 — planSEC-01 / 1
Row pitch and ground coverageDET-GCR-01

02Civil

  • Grading, cut and fill, and earthwork takeoff
  • AASHTO 93 roads, Manning ditches, catchments and culverts
  • Geotechnics from SPT tests
Typical terrace and slopesDET-MOV-01
Typical road sectionsDET-CAM-01
Road and culvert detailsDET-CAM-03

03Structure and piling

  • Piles and concrete blocks: overturning, sliding and pull-out
  • Wind and snow loads per ASCE, and lightning risk
Typical table — plan, supports and partsDET-MESA-01
Support type 1 — front post, low sideDET-PILE-01 / 2
Wind zoning of the siteWND-01

04Electrical

  • DC stringing and MPPT per IEC, NEC or AS/NZS 5033
  • Cable sizing, voltage drop and trenches
  • Resolved cable crossings, with their table and a section through each crossing
  • Substation, step-up transformer, point of interconnection and BESS
Electrical segment TR01ELE-01 / 1
Typical trenchesDET-ZAN-01
Transformer station TR01 — equipment layoutEQP-CT-01 / 1

05Protection and control

  • IEC 60255 protection coordination, with time-current curves and N-1
  • Proposed 87T, 87B, 21, 67, 79 and 25 settings, with criteria and verification
  • Per-bay functional diagrams for the transformer station, the substation and the POI
  • Bay three-line diagrams, AC and DC voltage distribution, and control cables

Protection settings are issued for review: the signing engineer ratifies the criteria.

Time-current coordinationELE-CRV-01
Functional diagram — trip matrixELE-FUN-01 / 3
Functional diagram — trip logicELE-FUN-01 / 5

06Grid studies

  • Load flow and short circuit
  • Arc flash per IEEE 1584-2018, from 0.6 to 15 kV
  • Grounding per IEEE 80
  • Export to ETAP and row-by-row verification of its results

Grid studies are screening-grade: the certified study still runs in ETAP or PSS/E.

The 33 studies, their standard and where each one stops
Earthing — TR01 station gridELE-PAT-01 / 2
Typical earthing details — bondsELE-PAT-02 / 1
Time-current co-ordination at the fault currentELE-CRV-01 / 1

07Drawings and documents

  • General single-line and MV switchboard single-lines
  • Auxiliary services, cable routing, pulling and a numbered cable schedule
  • Earthing grid, transformer-station layout and mounting
  • Piles, table cross-sections and earthworks
  • Calculation reports, Excel workbooks laid out as issued documents, and PVsyst export

What depends on purchased equipment stays as a drawing pending from the manufacturer, not drawn from memory.

What it delivers at each stage of a tender
General single-line diagramELE-SLD-01
13.2 kV substation MV switchboard — panel single-lineELE-TAB-01 / 2
Transformer station TR01 — plan and sectionDET-01 / 2