July 2026 · second release

Point of connection with provenance, the Argentine system case, and site prospecting

  • Electrical

    Interconnection lens: the substation on the map and the bus in the system case become one selectable candidate. Before anything is written to the drawing, an offer shows the point of connection, short-circuit power, X/R, and voltage, each figure carrying its declared origin: operator case, open-grid screening, or typed by you.

  • Electrical

    Minimum short-circuit power finally has somewhere to land. It is the number that decides whether protection sees the fault, and until now it was computed, printed, and dropped. When the case does not provide it, the field stays empty and the offer says so — the maximum is never copied in its place.

  • Data

    The Argentine system case downloads from inside the plugin: 0.36 MB read out of the 347 MB reference archive, fetching only the scenario you asked for. The short-circuit envelope takes its floor from a real off-peak dispatch and its ceiling from a peak one, each end attributed to its scenario.

  • Electrical

    PSS/E case buses carry no coordinates: matching them by name and voltage against the open grid gives each one a place and a distance to your site. A bus with no match does not drop off the list, and an ambiguous one is declared ambiguous instead of being resolved by proximity.

  • Electrical

    Six new studies: auto-reclose with dead time, instrument transformers with saturation evaluated at the burden actually connected, frequency events with windowed ROCOF, islanding — including the blind zone of a balanced island —, plant controller loss, and bus-split contingency.

  • Electrical

    Grid data that was never entered now says so, in the window and in the calculation report. The default value stopped being indistinguishable from a figure somebody verified.

  • Civil

    Redesigned pile distribution window, with the park map and families told apart. The slope limit rebuilds the piles instead of relabelling them, and the slope what-if now answers in both directions.

  • Product

    A site screened on the web lands in the drawing through ELAP_IMPORT_PROSPECT: boundary, exclusions, point of connection, and the site origin in latitude and longitude. The web supplies the coordinates; you type none of them.

July 2026 · first release

Earthwork takeoff, multi-provider weather, and protection coordination

  • Civil

    Earthwork takeoff: cut surplus with swell and compaction factors, trench backfill, and civil quantity rows integrated into the BOM.

  • Data

    Multi-provider weather: PVGIS, NASA POWER, Open-Meteo, NSRDB, and Solcast, with your own API key per provider stored encrypted on your machine.

  • Electrical

    Protection coordination with inverter backfeed, IEC 60255 time-current curves, and MV ring verification under N-1 contingency.

  • Electrical

    Interactive TCC curve workbench to tune and document coordination.

  • Electrical

    MV collector and HV line sizing with tapered feeders per segment.

  • Electrical

    BESS inside the drawing flow: from container layout to the single-line diagram.

Platform baseline

What ELAP already shipped before this log, summarized by area.

Terrain and civil

  • Terrain import in 5 formats plus OSM obstacles
  • TIN, proposed surfaces, and grading with cut/fill balance
  • Piles, foundations, and embedment profiles
  • Roads, drainage, and multi-standard culverts
  • Wind and snow loads (ASCE) and lightning risk

Layout and energy

  • SAT, fixed-tilt, and TFT multi-row trackers with 3D preview
  • DC stringing and MPPT assignment
  • PVsyst-domain shading on real terrain
  • Scenario-based capacity optimization

Electrical studies

  • Load flow and short circuit
  • Arc flash IEEE 1584-2018
  • Grounding IEEE 80
  • Substation, GSU, and point of interconnection
  • Single-line diagram (SLD) and exportable calculation reports

Product

  • Centralized export of reports and drawings
  • Editable equipment and cable catalogs
  • AI copilot inside AutoCAD