Interactive prototype · all figures are examples[CNV registration: pending]Projected returns, not guaranteedInvestment is subject to Argentine regulation
San Juan · CauceteGrid access
PSF Caucete Norte
30.1 MWp · Single-axis tracker · bifacial · MATER PPA under negotiation · USD 56/MWh
Key factskey information sheet · all figures are examples
| Item | Value | Source |
|---|---|---|
| What it is | 30.12 MWp (25.0 MWac) solar plant in Caucete, San Juan · Single-axis tracker · bifacial · sells its energy under MATER PPA under negotiation at USD 56/MWh | ELAP estimate ELAP · report rev A · P50/P90 study · 07/20/2026 |
| Amount being raised | USD 9.30 M from the crowd, out of a CAPEX of USD 18.03 M (USD 0.599/Wp) · 0 % raised · opens once priority is granted | Contract 2 % · ELAP estimate 98 % as of 07/20/2026 |
| Minimum ticket | To be defined: financing has not opened | Contract Platform terms, art. 9 · 07/01/2026 |
| Return | P50 12.4 % · P90 10.6 % of contributed capital in year 1 · projected, not guaranteed | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| Term | PPA under negotiation · 25-year useful life | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| Main risks | Grid access · Buyer · Price | ELAP estimate ELAP · report rev A · P50/P90 study · 07/20/2026 |
| Total fees | USD 1,982,524 one-off (11.0 % of CAPEX) · USD 1,188,605 per year (31.3 % of year-1 revenue, including debt interest) | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
[Model: key information sheet under EU Regulation 2020/1503 and CNV RG 717/2018 · to be checked in the legal memo]
Who takes part
| Role | Who | Contribution | Status |
|---|---|---|---|
| Land | Finca Los Nogales (example) | Lease USD 550 per ha per year | Ready |
| Buyer | Mining company, Jáchal department | Letter of intent · 12-year PPA under negotiation | In progress |
| EPC | 3 bids being compared | In progress | |
| Engineering | ELAP | rev A | Ready |
Capital structure example
Total USD 18.03 M = CAPEX, sum of the bill of quantities · USD 0.599/Wp · contributed capital (excluding debt) USD 9.30 M
Explicit risks
| Risk | What can happen | What limits it |
|---|---|---|
| Grid access | Dispatch priority has not been assigned yet. Without it, financing does not open. | Free capacity of 40 MW reported; application filed 09/2026. |
| Buyer | No signed PPA. | Letter of intent with a mining company; price and term are being negotiated. |
| Price | USD 56/MWh is the price under negotiation, not a signed one. | The sensitivity shows the price −10 %. |
Questions
No questions yet.
Financing
Not open yet. We will let you know when the project has a buyer and dispatch priority.
Grid access
- Node
- Caucete 132 kV substation
- Free capacity
- 40 MW (CAMMESA, public data)
- Requested capacity
- 25.0 MW
- Dispatch priority
- Requested 09/2026 · under evaluation
- Guarantee deposit
- Pending
Energy buyer
Mining company, Jáchal department · MATER Large User · letter of intent
MATER PPA under negotiation · USD 56/MWh
Stages
01Equipment and quantities24 lines · total USD 18,033,510 = CAPEX
| Category | Description | Manufacturer and model | Specification | Quantity | Unit price | Total | Source | Purchase status |
|---|---|---|---|---|---|---|---|---|
| Main equipment, item by item · click a row to see warranty, country and datasheet | ||||||||
| Equipment | Bifacial PV module | JinkoSolarTiger Neo JKM585N-72HL4-BDV | 585 Wp · N-type bifacial · 1,500 V | 51,480 pcs | USD 64.35 | USD 3,312,738 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Equipment | String inverter | HuaweiSUN2000-330KTL-H1 | 300 kW · 1,500 V · 6 MPPT | 84 pcs | USD 10,200 | USD 856,800 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Structure | Single-axis tracker, one row (1P) | ArctechSkyLine II | 1P · 52 modules · ±55° | 990 tables | USD 2,740 | USD 2,712,600 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Medium voltage | Oil-immersed power transformer | Tadeo CzerwenyTPC 7500 kVA ONAN | 7.5 MVA · 33/0.8 kV · Dyn11 | 4 pcs | USD 135,000 | USD 540,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Medium voltage | Medium-voltage switchgear, 3 functions | Ormazabalcgm.3 36 kV | 36 kV · 2 lines + protection | 4 pcs | USD 46,000 | USD 184,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Electrical BOS | DC solar cable | PrysmianTecsun H1Z2Z2-K | 1 × 6 mm² · 1.5 kV | 120,000 m | USD 0.95 | USD 114,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Electrical BOS | Low-voltage cable, inverter to station | IMSASubterráneo XLPE Al | 1 × 240 mm² · 1.8/3 kV | 37,800 m | USD 6.20 | USD 234,360 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Medium voltage | Medium-voltage cable, internal network | CimetXLPE 18/30 kV Al | 1 × 240 mm² · 33 kV | 15,000 m | USD 17.80 | USD 267,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Grid connection | Substation step-up transformer | Tadeo CzerwenyTPC 30 MVA ONAN/ONAF | 30 MVA · 132/33 kV · YNd11 | 1 pcs | USD 1,250,000 | USD 1,250,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Minor items, by category | ||||||||
| Structure | Pile driving and mechanical installation of the trackers | — | 0.030 USD/Wp | 1 lump sum | USD 1,038,995 | USD 1,038,995 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Electrical BOS | String boxes, protection, earthing, monitoring and electrical installation | — | 0.052 USD/Wp | 1 lump sum | USD 1,800,925 | USD 1,800,925 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Medium voltage | Housing, foundations and installation of the MV stations | — | per station | 4 pcs | USD 29,900 | USD 119,600 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Civil works | Earthworks, internal roads, fencing, drainage and site compound | — | 0.052 USD/Wp | 1 lump sum | USD 1,800,925 | USD 1,800,925 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Grid connection | 132 kV high-voltage line, single circuit | — | per km | 3.2 km | USD 212,750 | USD 680,800 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Grid connection | Outgoing bay at the substation, protection and SMEC metering | — | 1 bay | 1 lump sum | USD 483,000 | USD 483,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Engineering | ELAP engineering: basic, detailed, P50/P90 and as-built | — | 0.012 USD/Wp | 1 lump sum | USD 361,390 | USD 361,390 | ELAP estimate ELAP · report rev A · 07/20/2026 | Purchased |
| Development | ELAP development: permits, environmental impact and dispatch priority management | — | 0.018 USD/Wp | 1 lump sum | USD 542,084 | USD 542,084 | ELAP estimate ELAP · report rev A · 07/20/2026 | Purchased |
| Development | Independent engineer: design review and construction certification | — | USD 2,500 per MWp | 1 lump sum | USD 75,290 | USD 75,290 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Trustee | Trust formation and legal structuring | — | fixed fee | 1 lump sum | USD 45,000 | USD 45,000 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Insurance | All-risk construction and transport insurance | — | 0.45 % of construction | 1 lump sum | USD 69,281 | USD 69,281 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Platform fee | Platform placement fee | — | 3 % of the crowd raise | 1 lump sum | USD 279,000 | USD 279,000 | Contract Platform terms, art. 9 · 07/01/2026 | Awarded |
| Contingency | Construction contingency | — | 4 % of construction | 1 lump sum | USD 615,830 | USD 615,830 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Financing cost | Cost of investor installments and debt structuring | — | 5 % of the amount paid in installments + 1 % of the debt | 1 lump sum | USD 296,585 | USD 296,585 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Taxes | Import duties, statistics fee and non-recoverable taxes | — | 5 % of imports from outside Mercosur | 1 lump sum | USD 353,307 | USD 353,307 | ELAP estimate ELAP · report rev A · 07/20/2026 | To quote |
| Bill of quantities total · 0.599 USD/Wp over 30.116 MWp | USD 18,033,510 | |||||||
Prices in USD excluding VAT. Supplier, EPC, O&M and trustee names are examples; manufacturers and models are real and their prices are examples.
02Prices and CAPEXUSD 18,033,510 · 0.599 USD/Wp
| Category | USD | USD/Wp | % of total | Market reference USD/Wp | Platform average USD/Wp | Source |
|---|---|---|---|---|---|---|
| Equipment | USD 4,169,538 | 0.138 | 23.1 % | 0.155 | 0.144 | ELAP estimate as of 07/20/2026 |
| Structure | USD 3,751,595 | 0.125 | 20.8 % | 0.125 | 0.120 | ELAP estimate as of 07/20/2026 |
| Electrical BOS | USD 2,149,285 | 0.071 | 11.9 % | 0.080 | 0.077 | ELAP estimate as of 07/20/2026 |
| Medium voltage | USD 1,110,600 | 0.037 | 6.2 % | 0.035 | 0.047 | ELAP estimate as of 07/20/2026 |
| Civil works | USD 1,800,925 | 0.060 | 10.0 % | 0.060 | 0.062 | ELAP estimate as of 07/20/2026 |
| Grid connection | USD 2,413,800 | 0.080 | 13.4 % | 0.050 | 0.058 | ELAP estimate as of 07/20/2026 |
| Engineering | USD 361,390 | 0.012 | 2.0 % | 0.012 | 0.012 | ELAP estimate as of 07/20/2026 |
| Development | USD 617,374 | 0.021 | 3.4 % | 0.035 | 0.041 | ELAP estimate as of 07/20/2026 |
| Trustee | USD 45,000 | 0.001 | 0.2 % | 0.003 | 0.004 | ELAP estimate as of 07/20/2026 |
| Insurance | USD 69,281 | 0.002 | 0.4 % | 0.002 | 0.002 | ELAP estimate as of 07/20/2026 |
| Platform fee | USD 279,000 | 0.009 | 1.5 % | 0.010 | 0.010 | Contract as of 07/01/2026 |
| Contingency | USD 615,830 | 0.020 | 3.4 % | 0.020 | 0.020 | ELAP estimate as of 07/20/2026 |
| Financing cost | USD 296,585 | 0.010 | 1.6 % | 0.012 | 0.010 | ELAP estimate as of 07/20/2026 |
| Taxes | USD 353,307 | 0.012 | 2.0 % | 0.008 | 0.008 | ELAP estimate as of 07/20/2026 |
| Total | USD 18,033,510 | 0.599 | 100 % | 0.607 | 0.614 | Contract 2 % · ELAP estimate 98 % as of 07/20/2026 |
Market reference: ELAP estimate ELAP · 2026 market reference, 19 budget prices · 09/15/2026. The platform average is that of the other 6 projects on this page. Each category is the sum of its lines in the bill of quantities.
03Open tenderanonymous until awarded, named afterwards
No quotes yet. The request is published in Suppliers.
04Use of fundsUSD 0 disbursed of USD 18,033,510
| Sources | USD | % |
|---|---|---|
| Land, in kind | USD 0 | 0.0 % |
| Equipment, in kind | USD 0 | 0.0 % |
| Crowd | USD 9,300,000 | 51.6 % |
| Bank debt | USD 8,733,510 | 48.4 % |
| Total | USD 18,033,510 | 100 % |
| Uses | USD | % |
|---|---|---|
| Equipment | USD 4,169,538 | 23.1 % |
| Structure | USD 3,751,595 | 20.8 % |
| Electrical BOS | USD 2,149,285 | 11.9 % |
| Medium voltage | USD 1,110,600 | 6.2 % |
| Civil works | USD 1,800,925 | 10.0 % |
| Grid connection | USD 2,413,800 | 13.4 % |
| Engineering | USD 361,390 | 2.0 % |
| Development | USD 617,374 | 3.4 % |
| Trustee | USD 45,000 | 0.2 % |
| Insurance | USD 69,281 | 0.4 % |
| Platform fee | USD 279,000 | 1.5 % |
| Contingency | USD 615,830 | 3.4 % |
| Financing cost | USD 296,585 | 1.6 % |
| Taxes | USD 353,307 | 2.0 % |
| Total | USD 18,033,510 | 100 % |
In-kind contributions (USD 0: land and equipment for equity) do not go through the account. The rest is paid from the trust account against certified milestones by the independent engineer, and every disbursement is published here.
| Date | Milestone | Amount | Use | Certificate | Status |
|---|---|---|---|---|---|
| 05/20/2027 | Financing close | USD 1,302,764 | Engineering, development, trustee and placement fee | on certification | Planned |
| 07/20/2027 | EPC signing and advance | USD 2,509,612 | EPC advance | on certification | Planned |
| 08/20/2027 | Modules delivered to site | USD 5,019,224 | Modules and inverters on delivery | on certification | Planned |
| 09/20/2027 | Pile driving | USD 2,007,690 | Pile driving and structure | on certification | Planned |
| 10/20/2027 | Mechanical installation | USD 2,174,997 | Mechanical installation | on certification | Planned |
| 11/20/2027 | Electrical installation | USD 2,007,690 | Electrical BOS and cables | on certification | Planned |
| 12/20/2027 | MV station and line | USD 1,673,075 | MV stations, line and outgoing bay | on certification | Planned |
| 01/20/2028 | CAMMESA commercial operation | USD 1,338,458 | EPC balance, contingency and retention | on certification | Planned |
| Total through the trust account | USD 18,033,510 | CAPEX minus in-kind contributions | |||
05Who gets paid whatUSD 1,982,524 one-off · USD 1,188,605 per year
| Party | Who | Item | Basis | Amount USD | When | Source |
|---|---|---|---|---|---|---|
| Platform | Mercado Solar | Placement fee | 3 % of the crowd raise, once at close | USD 279,000 | Once | Contract Platform terms, art. 9 · 07/01/2026 |
| Platform | Mercado Solar | Administration and secondary market | 1 % of revenue, per year | USD 37,946 | Per year | Contract Platform terms, art. 10 · 07/01/2026 |
| ELAP | ELAP | Engineering | 0.012 USD/Wp | USD 361,390 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| ELAP | ELAP | Development | 0.018 USD/Wp | USD 542,084 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust formation | fixed fee | USD 45,000 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust administration | 0.8 % of revenue, per year | USD 30,357 | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| EPC | to be defined | EPC's declared margin | 10 % of the works in its scope (included in the bill of quantities) | USD 592,425 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| O&M | to be defined | Operation and maintenance | USD 14,000 per MWp per year | USD 421,621 | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| Bank | Banco Regional (example) | Debt structuring | 1 % of the debt | USD 87,335 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| Bank | Banco Regional (example) | Year-1 interest | 8 % a year on the debt | USD 698,681 | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| Independent engineer | to be defined | Technical review and construction certification | USD 2,500 per MWp | USD 75,290 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| One-off, within CAPEX | USD 1,982,524 | 11.0 % of CAPEX | ||||
| Annual, year 1 | USD 1,188,605 | from the payment waterfall | ||||
06Production and assumptionsP50 67.76 GWh · P90 63.24 GWh per year · Source: ELAP estimate · ELAP · report rev A · P50/P90 study · 07/20/2026
| Data or assumption | Value |
|---|---|
| P50 production | 67.76 GWh per year · 2,250 kWh/kWp |
| P90 production | 63.24 GWh per year · 2,100 kWh/kWp |
| Weather data source | PVGIS-SARAH3 |
| Years in the series | 2005 to 2023 (19 years) |
| Global horizontal irradiation (GHI) | 2,140 kWh/m² per year |
| Bifacial gain | 7.8 % |
| Total system losses | 13.6 % |
| Soiling | 2.0 % with quarterly cleaning |
| Availability | 99.0 % |
| Grid curtailment | 2.0 % |
| Annual module degradation | 0.4 % per year (manufacturer's linear warranty) |
| Combined uncertainty (1 σ) | 5.2 % · P90 = P50 × (1 − 1.28 σ) |
07RevenueMATER PPA under negotiation
| Item | Value | Source |
|---|---|---|
| Price | USD 56/MWh under negotiation | ELAP estimate ELAP · assumption taken from the letter of intent · 09/15/2026 |
| Term | 12 years under negotiation | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| Indexation | To be defined | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| Counterparty | Mining company, Jáchal department · MATER Large User | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| Guarantees | To be negotiated | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| Energy covered | 100 % of the energy | ELAP estimate Mining company's letter of intent · 09/10/2026 |
| After the contract | Spot, USD 45/MWh as an example | ELAP estimate ELAP · report rev A · 07/20/2026 |
08Payment waterfallyear 1 · projected
| Order | Item | Basis | USD year 1, P50 | % of revenue | USD year 1, P90 | Source |
|---|---|---|---|---|---|---|
| Energy sales revenue | 67.76 GWh × USD 56/MWh | USD 3,794,591 | 100.0 % | USD 3,541,618 | ELAP estimate ELAP · assumption taken from the letter of intent · 09/15/2026 | |
| 1 | Operation and maintenance | USD 14,000 per MWp per year | −USD 421,621 | 11.1 % | −USD 421,621 | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| 2 | Land lease | 110 ha × USD 550 per ha per year | −USD 60,500 | 1.6 % | −USD 60,500 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| 3 | Operational all-risk insurance | 0.3 % of CAPEX per year | −USD 54,101 | 1.4 % | −USD 54,101 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| 4 | Trustee fee | 0.8 % of revenue | −USD 30,357 | 0.8 % | −USD 28,333 | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| 5 | Platform administration fee | 1 % of revenue | −USD 37,946 | 1.0 % | −USD 35,416 | Contract Platform terms, art. 10 · 07/01/2026 |
| 6 | Municipal fees and gross receipts tax | 1.2 % of revenue | −USD 45,535 | 1.2 % | −USD 42,499 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| 7 | Income tax | 35 % of profit, with 25-year depreciation | −USD 603,579 | 15.9 % | −USD 517,694 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| 8 | Debt service (principal and interest) | USD 8.73 M at 8 % over 10 years | −USD 1,301,551 | 34.3 % | −USD 1,301,551 | ELAP estimate ELAP · report rev A · cost assumptions · 07/20/2026 |
| 9 | Inverter replacement reserve | USD 3,000 per MWp per year | −USD 90,347 | 2.4 % | −USD 90,347 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
| 10 | Distribution to investors | 12.4 % of contributed capital | USD 1,149,055 | 30.3 % | USD 989,556 | ELAP estimate ELAP · trust model, report rev A · 07/20/2026 |
First operation, taxes and debt; then reserves; and only after that the investors. The return on the sheet is the last line divided by the contributed capital (USD 9,300,000).
09Sensitivityyear 1 · same model as the payment waterfall · Source: ELAP estimate · ELAP · trust model, report rev A · 07/20/2026
| Case | Year-1 return | Versus base | Distribution USD | Per USD 1,000 |
|---|---|---|---|---|
| Base case (P50) | 12.4 % | — | USD 1,149,055 | USD 124 |
| Sale price −10 % | 9.8 % | −2.6 pp | USD 909,806 | USD 98 |
| P90 production | 10.6 % | −1.7 pp | USD 989,556 | USD 106 |
| CAPEX +10 %, with more debt | 10.2 % | −2.1 pp | USD 952,527 | USD 102 |
| 20 % exchange-rate gap | 10.3 % | −2.1 pp | USD 957,546 | USD 103 |
CAPEX +10 %: the overrun is financed with more debt. Exchange-rate gap: revenue is collected in pesos at the official rate and the investor converts to dollars at a rate 20 % higher.
10Construction progressplanned schedule · Source: ELAP estimate · ELAP · report rev A · schedule · 07/20/2026
| Milestone | Planned | Actual | Delay |
|---|---|---|---|
| EPC signing and advance | 06/15/2027 | pending | — |
| Modules delivered to site | 08/15/2027 | pending | — |
| Pile driving | 09/15/2027 | pending | — |
| Mechanical installation | 10/15/2027 | pending | — |
| Electrical installation | 11/15/2027 | pending | — |
| MV station and line | 12/15/2027 | pending | — |
| Energization | 01/15/2028 | pending | — |
| CAMMESA commercial operation | 02/15/2028 | pending | — |
| Main equipment | Of 9 |
|---|---|
| Awarded or later | 0 |
| Purchased | 0 |
| Delivered to site | 0 |
| Installed | 0 |
| Month | Planned | Actual | Curve |
|---|---|---|---|
| 06/2027 | 0 % | — | |
| 07/2027 | 3 % | — | |
| 08/2027 | 10 % | — | |
| 09/2027 | 22 % | — | |
| 10/2027 | 35 % | — | |
| 11/2027 | 50 % | — | |
| 12/2027 | 65 % | — | |
| 01/2028 | 78 % | — | |
| 02/2028 | 90 % | — | |
| 03/2028 | 97 % | — | |
| 04/2028 | 100 % | — |
Purchase status of each item in section 1. Actual dates and progress: independent engineer's certificates.
11Change logpublic to everyone · Source: Actual · CAMMESA filing note · 09/15/2026
| Date | What changed | From | To | Why |
|---|---|---|---|---|
| 09/15/2026 | Grid access | Not requested | Application filed | Dispatch priority application filed with CAMMESA. |
When a figure changes source (estimated, quoted, contracted, actual), the previous one stays here.
12Documentsdata room
- Trust agreementPending
- ProspectusPending
- Power purchase agreementPending
- ELAP engineering report, rev APDF · 07/2026View
- Grid access studyPDF · 09/2026 · application filedView
- Independent engineer's technical auditPending
- Quarterly financial statements of the trustPending