Salta · CafayateEngineering
PSF Cafayate
8.0 MWp · Single-axis tracker · bifacial · PPA to be defined
Key factskey information sheet · all figures are examples
| Item | Value | Source |
|---|---|---|
| What it is | 8.03 MWp (6.6 MWac) solar plant in Cafayate, Salta · Single-axis tracker · bifacial · sells its energy under PPA to be defined | ELAP estimate ELAP · report rev A · P50/P90 study · 09/25/2026 |
| Amount being raised | USD 2.60 M from the crowd, out of a CAPEX of USD 5.17 M (USD 0.644/Wp) · 0 % raised · being put together | Contract 6 % · Quote 14 % · ELAP estimate 80 % as of 10/02/2026 |
| Minimum ticket | To be defined: financing has not opened | Contract Platform terms, art. 9 · 07/01/2026 |
| Return | To be defined: without a sale price there is no projection | ELAP estimate ELAP · trust model, report rev A · 09/25/2026 |
| Term | to be defined | ELAP estimate ELAP · report rev A · 09/25/2026 |
| Main risks | No buyer · Grid access | ELAP estimate ELAP · report rev A · P50/P90 study · 09/25/2026 |
| Total fees | USD 590,259 one-off (11.4 % of CAPEX) · USD 282,275 per year | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
[Model: key information sheet under EU Regulation 2020/1503 and CNV RG 717/2018 · to be checked in the legal memo]
Who takes part
| Role | Who | Contribution | Status |
|---|---|---|---|
| Land | 24 ha farm (example) | In-kind contribution for equity | Ready |
| Engineering | ELAP | rev A | Ready |
| Buyer | to be defined | No buyer | Missing |
| EPC | to be defined | No quote | Missing |
Capital structure example
Total USD 5.17 M = CAPEX, sum of the bill of quantities · USD 0.644/Wp · contributed capital (excluding debt) USD 2.85 M
No projection yet: the project has neither a buyer nor a sale price.
Explicit risks
| Risk | What can happen | What limits it |
|---|---|---|
| No buyer | There is no power purchase agreement. | Two conversations with local industries. |
| Grid access | Dispatch priority has not been requested. | Free capacity of 12 MW reported by CAMMESA. |
Questions
No questions yet.
Financing
Not open yet. We will let you know when the project has a buyer and dispatch priority.
Grid access
- Node
- Cafayate 33 kV substation
- Free capacity
- 12 MW (CAMMESA, public data)
- Requested capacity
- 6.6 MW
- Dispatch priority
- Not requested
- Guarantee deposit
- Pending
Energy buyer
No buyer · 2 conversations
PPA to be defined
Stages
01Equipment and quantities24 lines · total USD 5,173,808 = CAPEX
| Category | Description | Manufacturer and model | Specification | Quantity | Unit price | Total | Source | Purchase status |
|---|---|---|---|---|---|---|---|---|
| Main equipment, item by item · click a row to see warranty, country and datasheet | ||||||||
| Equipment | Bifacial PV module | Canadian SolarTOPBiHiKu6 CS6W-585TB | 585 Wp · N-type bifacial · 1,500 V | 13,728 pcs | USD 64.35 | USD 883,397 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Equipment | String inverter, model to be defined | to be defined | 300 kW · 1,500 V · reference price | 22 pcs | USD 10,200 | USD 224,400 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Structure | Single-axis tracker, one row (1P) | NextrackerNX Horizon | 1P · 52 modules · ±60° | 264 tables | USD 2,710 | USD 715,440 | Quote Supplier A · 10/02/2026 · expires 12/01/2026 | Quoted |
| Medium voltage | Oil-immersed power transformer | Tadeo CzerwenyTPC 3150 kVA ONAN | 3.15 MVA · 33/0.8 kV · Dyn11 | 2 pcs | USD 72,000 | USD 144,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Medium voltage | Medium-voltage switchgear, 3 functions | Ormazabalcgm.3 36 kV | 36 kV · 2 lines + protection | 2 pcs | USD 46,000 | USD 92,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Electrical BOS | DC solar cable | PrysmianTecsun H1Z2Z2-K | 1 × 6 mm² · 1.5 kV | 32,000 m | USD 0.95 | USD 30,400 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Electrical BOS | Low-voltage cable, inverter to station | IMSASubterráneo XLPE Al | 1 × 240 mm² · 1.8/3 kV | 9,900 m | USD 6.20 | USD 61,380 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Medium voltage | Medium-voltage cable, internal network | CimetXLPE 18/30 kV Al | 1 × 150 mm² · 33 kV | 4,500 m | USD 13.20 | USD 59,400 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Minor items, by category | ||||||||
| Structure | Pile driving and mechanical installation of the trackers | — | 0.030 USD/Wp | 1 lump sum | USD 301,158 | USD 301,158 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Electrical BOS | String boxes, protection, earthing, monitoring and electrical installation | — | 0.052 USD/Wp | 1 lump sum | USD 522,007 | USD 522,007 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Medium voltage | Housing, foundations and installation of the MV stations | — | per station | 2 pcs | USD 32,500 | USD 65,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Civil works | Earthworks, internal roads, fencing, drainage and site compound | — | 0.052 USD/Wp | 1 lump sum | USD 522,007 | USD 522,007 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Grid connection | 33 kV medium-voltage line, concrete poles | — | per km | 4 km | USD 92,500 | USD 370,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Grid connection | Outgoing bay at the substation, protection and SMEC metering | — | 1 bay | 1 lump sum | USD 250,000 | USD 250,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Engineering | ELAP engineering: basic, detailed, P50/P90 and as-built | — | 0.012 USD/Wp | 1 lump sum | USD 96,371 | USD 96,371 | ELAP estimate ELAP · report rev A · 09/25/2026 | Purchased |
| Development | ELAP development: permits, environmental impact and dispatch priority management | — | 0.018 USD/Wp | 1 lump sum | USD 144,556 | USD 144,556 | ELAP estimate ELAP · report rev A · 09/25/2026 | Purchased |
| Development | Independent engineer: design review and construction certification | — | USD 2,500 per MWp | 1 lump sum | USD 20,077 | USD 20,077 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Development | Land, in-kind contribution for equity (valuation) | — | in kind | 1 lump sum | USD 250,000 | USD 250,000 | Contract Land contribution agreement · valuation (example) · 05/20/2026 | Purchased |
| Trustee | Trust formation and legal structuring | — | fixed fee | 1 lump sum | USD 25,000 | USD 25,000 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Insurance | All-risk construction and transport insurance | — | 0.45 % of construction | 1 lump sum | USD 19,083 | USD 19,083 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Platform fee | Platform placement fee | — | 3 % of the crowd raise | 1 lump sum | USD 78,000 | USD 78,000 | Contract Platform terms, art. 9 · 07/01/2026 | Awarded |
| Contingency | Construction contingency | — | 4 % of construction | 1 lump sum | USD 169,624 | USD 169,624 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Financing cost | Cost of investor installments and debt structuring | — | 5 % of the amount paid in installments + 1 % of the debt | 1 lump sum | USD 81,738 | USD 81,738 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Taxes | Import duties, statistics fee and non-recoverable taxes | — | 5 % of imports from outside Mercosur | 1 lump sum | USD 48,770 | USD 48,770 | ELAP estimate ELAP · report rev A · 09/25/2026 | To quote |
| Bill of quantities total · 0.644 USD/Wp over 8.031 MWp | USD 5,173,808 | |||||||
Prices in USD excluding VAT. Supplier, EPC, O&M and trustee names are examples; manufacturers and models are real and their prices are examples.
02Prices and CAPEXUSD 5,173,808 · 0.644 USD/Wp
| Category | USD | USD/Wp | % of total | Market reference USD/Wp | Platform average USD/Wp | Source |
|---|---|---|---|---|---|---|
| Equipment | USD 1,107,797 | 0.138 | 21.4 % | 0.155 | 0.144 | ELAP estimate as of 09/25/2026 |
| Structure | USD 1,016,598 | 0.127 | 19.6 % | 0.125 | 0.120 | Quote 70 % · ELAP estimate 30 % as of 10/02/2026 |
| Electrical BOS | USD 613,787 | 0.076 | 11.9 % | 0.080 | 0.076 | ELAP estimate as of 09/25/2026 |
| Medium voltage | USD 360,400 | 0.045 | 7.0 % | 0.035 | 0.045 | ELAP estimate as of 09/25/2026 |
| Civil works | USD 522,007 | 0.065 | 10.1 % | 0.060 | 0.061 | ELAP estimate as of 09/25/2026 |
| Grid connection | USD 620,000 | 0.077 | 12.0 % | 0.050 | 0.058 | ELAP estimate as of 09/25/2026 |
| Engineering | USD 96,371 | 0.012 | 1.9 % | 0.012 | 0.012 | ELAP estimate as of 09/25/2026 |
| Development | USD 414,633 | 0.052 | 8.0 % | 0.035 | 0.036 | Contract 60 % · ELAP estimate 40 % as of 09/25/2026 |
| Trustee | USD 25,000 | 0.003 | 0.5 % | 0.003 | 0.004 | ELAP estimate as of 09/25/2026 |
| Insurance | USD 19,083 | 0.002 | 0.4 % | 0.002 | 0.002 | ELAP estimate as of 09/25/2026 |
| Platform fee | USD 78,000 | 0.010 | 1.5 % | 0.010 | 0.010 | Contract as of 07/01/2026 |
| Contingency | USD 169,624 | 0.021 | 3.3 % | 0.020 | 0.020 | ELAP estimate as of 09/25/2026 |
| Financing cost | USD 81,738 | 0.010 | 1.6 % | 0.012 | 0.009 | ELAP estimate as of 09/25/2026 |
| Taxes | USD 48,770 | 0.006 | 0.9 % | 0.008 | 0.008 | ELAP estimate as of 09/25/2026 |
| Total | USD 5,173,808 | 0.644 | 100 % | 0.607 | 0.606 | Contract 6 % · Quote 14 % · ELAP estimate 80 % as of 10/02/2026 |
Market reference: ELAP estimate ELAP · 2026 market reference, 19 budget prices · 09/15/2026. The platform average is that of the other 6 projects on this page. Each category is the sum of its lines in the bill of quantities.
03Open tenderanonymous until awarded, named afterwards
| Bidder | Offer | Unit price | Total | Versus lowest | Lead time | Result |
|---|---|---|---|---|---|---|
| Supplier A | Nextracker NX Horizon | USD 2,710 | USD 715,440 | lowest | 12 wk | Under evaluation |
04Use of fundsUSD 0 disbursed of USD 4,923,808
| Sources | USD | % |
|---|---|---|
| Land, in kind | USD 250,000 | 4.8 % |
| Equipment, in kind | USD 0 | 0.0 % |
| Crowd | USD 2,600,000 | 50.3 % |
| Bank debt | USD 2,323,808 | 44.9 % |
| Total | USD 5,173,808 | 100 % |
| Uses | USD | % |
|---|---|---|
| Equipment | USD 1,107,797 | 21.4 % |
| Structure | USD 1,016,598 | 19.6 % |
| Electrical BOS | USD 613,787 | 11.9 % |
| Medium voltage | USD 360,400 | 7.0 % |
| Civil works | USD 522,007 | 10.1 % |
| Grid connection | USD 620,000 | 12.0 % |
| Engineering | USD 96,371 | 1.9 % |
| Development | USD 414,633 | 8.0 % |
| Trustee | USD 25,000 | 0.5 % |
| Insurance | USD 19,083 | 0.4 % |
| Platform fee | USD 78,000 | 1.5 % |
| Contingency | USD 169,624 | 3.3 % |
| Financing cost | USD 81,738 | 1.6 % |
| Taxes | USD 48,770 | 0.9 % |
| Total | USD 5,173,808 | 100 % |
In-kind contributions (USD 250,000: land and equipment for equity) do not go through the account. The rest is paid from the trust account against certified milestones by the independent engineer, and every disbursement is published here.
| Date | Milestone | Amount | Use | Certificate | Status |
|---|---|---|---|---|---|
| 08/20/2027 | Financing close | USD 364,004 | Engineering, development, trustee and placement fee | on certification | Planned |
| 10/20/2027 | EPC signing and advance | USD 683,971 | EPC advance | on certification | Planned |
| 11/20/2027 | Modules delivered to site | USD 1,367,941 | Modules and inverters on delivery | on certification | Planned |
| 12/20/2027 | Pile driving | USD 547,176 | Pile driving and structure | on certification | Planned |
| 01/20/2028 | Mechanical installation | USD 592,774 | Mechanical installation | on certification | Planned |
| 02/20/2028 | Electrical installation | USD 547,176 | Electrical BOS and cables | on certification | Planned |
| 03/20/2028 | MV station and line | USD 455,980 | MV stations, line and outgoing bay | on certification | Planned |
| 04/20/2028 | CAMMESA commercial operation | USD 364,786 | EPC balance, contingency and retention | on certification | Planned |
| Total through the trust account | USD 4,923,808 | CAPEX minus in-kind contributions | |||
05Who gets paid whatUSD 590,259 one-off · USD 282,275 per year
| Party | Who | Item | Basis | Amount USD | When | Source |
|---|---|---|---|---|---|---|
| Platform | Mercado Solar | Placement fee | 3 % of the crowd raise, once at close | USD 78,000 | Once | Contract Platform terms, art. 9 · 07/01/2026 |
| Platform | Mercado Solar | Administration and secondary market | 1 % of revenue, per year | — | Per year | Contract Platform terms, art. 10 · 07/01/2026 |
| ELAP | ELAP | Engineering | 0.012 USD/Wp | USD 96,371 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| ELAP | ELAP | Development | 0.018 USD/Wp | USD 144,556 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust formation | fixed fee | USD 25,000 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust administration | 0.8 % of revenue, per year | — | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| EPC | to be defined | EPC's declared margin | 10 % of the works in its scope (included in the bill of quantities) | USD 203,017 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| O&M | Operadora Solar Andes (example) | Operation and maintenance | USD 12,000 per MWp per year | USD 96,371 | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| Bank | to be defined | Debt structuring | 1 % of the debt | USD 23,238 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| Bank | to be defined | Year-1 interest | 8 % a year on the debt | USD 185,905 | Per year | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| Independent engineer | to be defined | Technical review and construction certification | USD 2,500 per MWp | USD 20,077 | Once | ELAP estimate ELAP · report rev A · cost assumptions · 09/25/2026 |
| One-off, within CAPEX | USD 590,259 | 11.4 % of CAPEX | ||||
| Annual, year 1 | USD 282,275 | from the payment waterfall | ||||
06Production and assumptionsP50 18.47 GWh · P90 17.27 GWh per year · Source: ELAP estimate · ELAP · report rev A · P50/P90 study · 09/25/2026
| Data or assumption | Value |
|---|---|
| P50 production | 18.47 GWh per year · 2,300 kWh/kWp |
| P90 production | 17.27 GWh per year · 2,150 kWh/kWp |
| Weather data source | PVGIS-SARAH3 |
| Years in the series | 2005 to 2023 (19 years) |
| Global horizontal irradiation (GHI) | 2,230 kWh/m² per year |
| Bifacial gain | 7.6 % |
| Total system losses | 13.9 % |
| Soiling | 2.0 % with quarterly cleaning |
| Availability | 99.0 % |
| Grid curtailment | 2.0 % |
| Annual module degradation | 0.4 % per year (manufacturer's linear warranty) |
| Combined uncertainty (1 σ) | 5.1 % · P90 = P50 × (1 − 1.28 σ) |
07RevenuePPA to be defined · Source: ELAP estimate · ELAP · report rev A · 09/25/2026
| Item | Value |
|---|---|
| Price | No buyer: price to be defined |
| Term | To be defined |
| Counterparty | Two conversations with local industries |
08Payment waterfall
No sale price yet, so no payment waterfall: it is published once the project has a buyer.
09Sensitivity
Without a sale price there is no base case to compare.
10Construction progressplanned schedule · Source: ELAP estimate · ELAP · report rev A · schedule · 09/25/2026
| Milestone | Planned | Actual | Delay |
|---|---|---|---|
| EPC signing and advance | 09/15/2027 | pending | — |
| Modules delivered to site | 11/15/2027 | pending | — |
| Pile driving | 12/15/2027 | pending | — |
| Mechanical installation | 01/15/2028 | pending | — |
| Electrical installation | 02/15/2028 | pending | — |
| MV station and line | 03/15/2028 | pending | — |
| Energization | 04/15/2028 | pending | — |
| CAMMESA commercial operation | 05/15/2028 | pending | — |
| Main equipment | Of 8 |
|---|---|
| Awarded or later | 0 |
| Purchased | 0 |
| Delivered to site | 0 |
| Installed | 0 |
| Month | Planned | Actual | Curve |
|---|---|---|---|
| 09/2027 | 0 % | — | |
| 10/2027 | 4 % | — | |
| 11/2027 | 16 % | — | |
| 12/2027 | 32 % | — | |
| 01/2028 | 50 % | — | |
| 02/2028 | 68 % | — | |
| 03/2028 | 84 % | — | |
| 04/2028 | 96 % | — | |
| 05/2028 | 100 % | — |
Purchase status of each item in section 1. Actual dates and progress: independent engineer's certificates.
11Change logpublic to everyone
No changes since publication.
When a figure changes source (estimated, quoted, contracted, actual), the previous one stays here.
12Documentsdata room
- Trust agreementPending
- ProspectusPending
- Power purchase agreementPending
- ELAP engineering report, rev APDF · 09/2026View
- Grid access studyPending
- Independent engineer's technical auditPending
- Quarterly financial statements of the trustPending