Mendoza · MaipúOperation
PSF Cruz de Piedra
18.0 MWp · Single-axis tracker · bifacial · 15-year MATER PPA · USD 55/MWh
Key factskey information sheet · all figures are examples
| Item | Value | Source |
|---|---|---|
| What it is | 17.98 MWp (15.0 MWac) solar plant in Maipú, Mendoza · Single-axis tracker · bifacial · sells its energy under 15-year MATER PPA at USD 55/MWh | ELAP estimate ELAP · report as built · P50/P90 study · 05/15/2025 |
| Amount being raised | USD 5.60 M from the crowd, out of a CAPEX of USD 10.72 M (USD 0.596/Wp) · 100 % raised · closed 03/2024 | Actual 95 % · Contract 5 % as of 07/01/2026 |
| Minimum ticket | USD 110 · per share on the secondary market | Contract Platform terms, art. 9 · 07/01/2026 |
| Return | P50 11.0 % · P90 10.0 % of contributed capital in year 1 · projected, not guaranteed | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
| Term | 15-year PPA · operating since 05/2025 | Contract Signed MATER PPA · 12/12/2023 |
| Main risks | Price after the PPA · Production | ELAP estimate ELAP · report as built · P50/P90 study · 05/15/2025 |
| Total fees | USD 1,179,305 one-off (11.0 % of CAPEX) · USD 524,840 per year (25.5 % of year-1 revenue, including debt interest) | Contract Trust agreement, annex III · 03/10/2024 |
[Model: key information sheet under EU Regulation 2020/1503 and CNV RG 717/2018 · to be checked in the legal memo]
Who takes part
| Role | Who | Contribution | Status |
|---|---|---|---|
| Land | Farm (example) | In-kind contribution for equity | Ready |
| Trackers | Trackers del Oeste (example) | In-kind contribution for equity | Ready |
| O&M | Operadora Solar Andes (example) | USD 11 k per MWp per year | Ready |
| Buyer | Cement plant, Las Heras | 15-year PPA · USD 55/MWh | Ready |
| Trustee | Fiduciaria Pampa S.A. (example) | Ready | |
| Engineering | ELAP | as built | Ready |
Capital structure example
Total USD 10.72 M = CAPEX, sum of the bill of quantities · USD 0.596/Wp · contributed capital (excluding debt) USD 7.65 M
Explicit risks
| Risk | What can happen | What limits it |
|---|---|---|
| Price after the PPA | From 2040 the energy is sold on the spot market. | Base scenario USD 45/MWh. |
| Production | Some winter months came in below P50. | Actual month-by-month production is published on the sheet. |
Questions
- How much did it distribute in 2025? · machine translation10.2 % on capital, in quarterly payments. It is in the trust's annual report. · machine translationFiduciaria Pampa · 04/2026
Secondary market
- Distributed in 2025
- 10.2 % on capital
[Secondary market: subject to CNV rules]
Grid access
- Node
- Cruz de Piedra 132/33 kV substation
- Free capacity
- 22 MW (CAMMESA, public data)
- Requested capacity
- 15.0 MW
- Dispatch priority
- Assigned 06/2023 · in operation
- Guarantee deposit
- Released
Energy buyer
Cement plant, Las Heras · MATER Large User
15-year MATER PPA · USD 55/MWh
Stages
01Equipment and quantities24 lines · total USD 10,715,398 = CAPEX
| Category | Description | Manufacturer and model | Specification | Quantity | Unit price | Total | Source | Purchase status |
|---|---|---|---|---|---|---|---|---|
| Main equipment, item by item · click a row to see warranty, country and datasheet | ||||||||
| Equipment | Bifacial PV module | JinkoSolarTiger Neo JKM580N-72HL4-BDV | 580 Wp · N-type bifacial · 1,500 V | 30,992 pcs | USD 69.60 | USD 2,157,043 | Actual Invoice A-0004-00001187 · Importadora Andina (example) · 07/18/2024 | Installed |
| Equipment | String inverter | SungrowSG250HX | 250 kW · 1,500 V · 12 MPPT | 60 pcs | USD 9,600 | USD 576,000 | Actual Invoice A-0001-00000412 · Electro Cuyo (example) · 08/09/2024 | Installed |
| Structure | Single-axis tracker, one row (1P) | NextrackerNX Horizon | 1P · 52 modules · ±60° | 596 tables | USD 2,770 | USD 1,650,920 | Actual Delivery record · Trackers del Oeste (example) · 08/02/2024 | Installed |
| Medium voltage | Oil-immersed power transformer | Tadeo CzerwenyTPC 5000 kVA ONAN | 5 MVA · 33/0.8 kV · Dyn11 | 3 pcs | USD 104,000 | USD 312,000 | Actual Invoice A-0007-00010021 · Tadeo Czerweny · 11/20/2024 | Installed |
| Medium voltage | Medium-voltage switchgear, 3 functions | Ormazabalcgm.3 36 kV | 36 kV · 2 lines + protection | 3 pcs | USD 49,000 | USD 147,000 | Actual Invoice E-0003-00000318 · 11/05/2024 | Installed |
| Electrical BOS | DC solar cable | PrysmianTecsun H1Z2Z2-K | 1 × 6 mm² · 1.5 kV | 72,000 m | USD 1.02 | USD 73,440 | Actual Invoice B-0001-00003120 · 08/15/2024 | Installed |
| Electrical BOS | Low-voltage cable, inverter to station | IMSASubterráneo XLPE Al | 1 × 240 mm² · 1.8/3 kV | 27,000 m | USD 6.60 | USD 178,200 | Actual Invoice B-0001-00003121 · 08/15/2024 | Installed |
| Medium voltage | Medium-voltage cable, internal network | CimetXLPE 18/30 kV Al | 1 × 185 mm² · 33 kV | 9,000 m | USD 15.40 | USD 138,600 | Actual Invoice A-0002-00005512 · 09/10/2024 | Installed |
| Minor items, by category | ||||||||
| Structure | Pile driving and mechanical installation of the trackers | — | 0.030 USD/Wp | 1 lump sum | USD 674,076 | USD 674,076 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Electrical BOS | String boxes, protection, earthing, monitoring and electrical installation | — | 0.052 USD/Wp | 1 lump sum | USD 1,168,398 | USD 1,168,398 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Medium voltage | Housing, foundations and installation of the MV stations | — | per station | 3 pcs | USD 32,500 | USD 97,500 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Civil works | Earthworks, internal roads, fencing, drainage and site compound | — | 0.052 USD/Wp | 1 lump sum | USD 1,168,398 | USD 1,168,398 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Grid connection | 33 kV medium-voltage line, concrete poles | — | per km | 2.5 km | USD 92,500 | USD 231,250 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Grid connection | Outgoing bay at the substation, protection and SMEC metering | — | 1 bay | 1 lump sum | USD 275,000 | USD 275,000 | Actual Final construction certificate · Constructora Huarpe (example) · 04/30/2025 | Installed |
| Engineering | ELAP engineering: basic, detailed, P50/P90 and as-built | — | 0.012 USD/Wp | 1 lump sum | USD 215,704 | USD 215,704 | Actual ELAP invoices · 05/15/2025 | Installed |
| Development | ELAP development: permits, environmental impact and dispatch priority management | — | 0.018 USD/Wp | 1 lump sum | USD 323,556 | USD 323,556 | Actual ELAP invoices · 05/15/2025 | Installed |
| Development | Independent engineer: design review and construction certification | — | USD 2,500 per MWp | 1 lump sum | USD 44,938 | USD 44,938 | Actual Trustee's invoice · 03/15/2024 | Awarded |
| Development | Land, in-kind contribution for equity (valuation) | — | in kind | 1 lump sum | USD 400,000 | USD 400,000 | Contract Land contribution agreement · valuation (example) · 08/15/2023 | Purchased |
| Trustee | Trust formation and legal structuring | — | fixed fee | 1 lump sum | USD 35,000 | USD 35,000 | Actual Trustee's invoice · 03/15/2024 | Purchased |
| Insurance | All-risk construction and transport insurance | — | 0.45 % of construction | 1 lump sum | USD 39,815 | USD 39,815 | Actual Policy no. 301977 · premium paid · 04/01/2024 | Purchased |
| Platform fee | Platform placement fee | — | 3 % of the crowd raise | 1 lump sum | USD 168,000 | USD 168,000 | Contract Platform terms, art. 9 · 07/01/2026 | Awarded |
| Contingency | Construction contingency | — | 4 % of construction | 1 lump sum | USD 353,913 | USD 353,913 | Actual ELAP invoices · 05/15/2025 | To quote |
| Financing cost | Cost of investor installments and debt structuring | — | 5 % of the amount paid in installments + 1 % of the debt | 1 lump sum | USD 142,645 | USD 142,645 | Actual ELAP invoices · 05/15/2025 | To quote |
| Taxes | Import duties, statistics fee and non-recoverable taxes | — | 5 % of imports from outside Mercosur | 1 lump sum | USD 144,002 | USD 144,002 | Actual ELAP invoices · 05/15/2025 | To quote |
| Bill of quantities total · 0.596 USD/Wp over 17.975 MWp | USD 10,715,398 | |||||||
Prices in USD excluding VAT. Supplier, EPC, O&M and trustee names are examples; manufacturers and models are real and their prices are examples.
02Prices and CAPEXUSD 10,715,398 · 0.596 USD/Wp
| Category | USD | USD/Wp | % of total | Market reference USD/Wp | Platform average USD/Wp | Source |
|---|---|---|---|---|---|---|
| Equipment | USD 2,733,043 | 0.152 | 25.5 % | 0.155 | 0.142 | Actual as of 08/09/2024 |
| Structure | USD 2,324,996 | 0.129 | 21.7 % | 0.125 | 0.119 | Actual as of 04/30/2025 |
| Electrical BOS | USD 1,420,038 | 0.079 | 13.3 % | 0.080 | 0.076 | Actual as of 04/30/2025 |
| Medium voltage | USD 695,100 | 0.039 | 6.5 % | 0.035 | 0.046 | Actual as of 04/30/2025 |
| Civil works | USD 1,168,398 | 0.065 | 10.9 % | 0.060 | 0.061 | Actual as of 04/30/2025 |
| Grid connection | USD 506,250 | 0.028 | 4.7 % | 0.050 | 0.066 | Actual as of 04/30/2025 |
| Engineering | USD 215,704 | 0.012 | 2.0 % | 0.012 | 0.012 | Actual as of 05/15/2025 |
| Development | USD 768,494 | 0.043 | 7.2 % | 0.035 | 0.038 | Actual 48 % · Contract 52 % as of 05/15/2025 |
| Trustee | USD 35,000 | 0.002 | 0.3 % | 0.003 | 0.004 | Actual as of 03/15/2024 |
| Insurance | USD 39,815 | 0.002 | 0.4 % | 0.002 | 0.002 | Actual as of 04/01/2024 |
| Platform fee | USD 168,000 | 0.009 | 1.6 % | 0.010 | 0.010 | Contract as of 07/01/2026 |
| Contingency | USD 353,913 | 0.020 | 3.3 % | 0.020 | 0.020 | Actual as of 05/15/2025 |
| Financing cost | USD 142,645 | 0.008 | 1.3 % | 0.012 | 0.010 | Actual as of 05/15/2025 |
| Taxes | USD 144,002 | 0.008 | 1.3 % | 0.008 | 0.008 | Actual as of 05/15/2025 |
| Total | USD 10,715,398 | 0.596 | 100 % | 0.607 | 0.614 | Actual 95 % · Contract 5 % as of 07/01/2026 |
Market reference: ELAP estimate ELAP · 2026 market reference, 19 budget prices · 09/15/2026. The platform average is that of the other 6 projects on this page. Each category is the sum of its lines in the bill of quantities.
03Open tenderanonymous until awarded, named afterwards
| Bidder | Offer | Unit price | Total | Versus lowest | Lead time | Result |
|---|---|---|---|---|---|---|
| Importadora Litoral (example) | JA Solar JAM72D40-580/LB | USD 71.30 | USD 2,209,730 | +2.4 % | 14 wk | Not selected |
| Importadora Andina (example) | JinkoSolar Tiger Neo JKM580N-72HL4-BDV | USD 69.60 | USD 2,157,043 | lowest | 12 wk | Selected |
| Distribuidora Norte (example) | Trina Solar Vertex N TSM-NEG19RC.20 | USD 70.40 | USD 2,181,837 | +1.1 % | 20 wk | Not selected |
Why it won: Lowest price of the three and delivery before installation starts.
04Use of fundsUSD 8,664,478 disbursed of USD 8,664,478
| Sources | USD | % |
|---|---|---|
| Land, in kind | USD 400,000 | 3.7 % |
| Equipment, in kind | USD 1,650,920 | 15.4 % |
| Crowd | USD 5,600,000 | 52.3 % |
| Bank debt | USD 3,064,478 | 28.6 % |
| Total | USD 10,715,398 | 100 % |
| Uses | USD | % |
|---|---|---|
| Equipment | USD 2,733,043 | 25.5 % |
| Structure | USD 2,324,996 | 21.7 % |
| Electrical BOS | USD 1,420,038 | 13.3 % |
| Medium voltage | USD 695,100 | 6.5 % |
| Civil works | USD 1,168,398 | 10.9 % |
| Grid connection | USD 506,250 | 4.7 % |
| Engineering | USD 215,704 | 2.0 % |
| Development | USD 768,494 | 7.2 % |
| Trustee | USD 35,000 | 0.3 % |
| Insurance | USD 39,815 | 0.4 % |
| Platform fee | USD 168,000 | 1.6 % |
| Contingency | USD 353,913 | 3.3 % |
| Financing cost | USD 142,645 | 1.3 % |
| Taxes | USD 144,002 | 1.3 % |
| Total | USD 10,715,398 | 100 % |
In-kind contributions (USD 2,050,920: land and equipment for equity) do not go through the account. The rest is paid from the trust account against certified milestones by the independent engineer, and every disbursement is published here.
| Date | Milestone | Amount | Use | Certificate | Status |
|---|---|---|---|---|---|
| 03/20/2024 | Financing close | USD 787,198 | Engineering, development, trustee and placement fee | Trust closing record | Paid |
| 05/20/2024 | EPC signing and advance | USD 1,181,592 | EPC advance | Certificate no. 1 · Estudio Ingeniería Zonda (example) | Paid |
| 06/20/2024 | Modules delivered to site | USD 2,363,184 | Modules and inverters on delivery | Certificate no. 2 · Estudio Ingeniería Zonda (example) | Paid |
| 07/20/2024 | Pile driving | USD 945,274 | Pile driving and structure | Certificate no. 3 · Estudio Ingeniería Zonda (example) | Paid |
| 08/20/2024 | Mechanical installation | USD 1,024,046 | Mechanical installation | Certificate no. 4 · Estudio Ingeniería Zonda (example) | Paid |
| 09/20/2024 | Electrical installation | USD 945,274 | Electrical BOS and cables | Certificate no. 5 · Estudio Ingeniería Zonda (example) | Paid |
| 10/20/2024 | MV station and line | USD 787,728 | MV stations, line and outgoing bay | Certificate no. 6 · Estudio Ingeniería Zonda (example) | Paid |
| 11/20/2024 | CAMMESA commercial operation | USD 630,182 | EPC balance, contingency and retention | Certificate no. 7 · Estudio Ingeniería Zonda (example) | Paid |
| Total through the trust account | USD 8,664,478 | CAPEX minus in-kind contributions | |||
05Who gets paid whatUSD 1,179,305 one-off · USD 524,840 per year
| Party | Who | Item | Basis | Amount USD | When | Source |
|---|---|---|---|---|---|---|
| Platform | Mercado Solar | Placement fee | 3 % of the crowd raise, once at close | USD 168,000 | Once | Contract Platform terms, art. 9 · 07/01/2026 |
| Platform | Mercado Solar | Administration and secondary market | 1 % of revenue, per year | USD 20,564 | Per year | Contract Platform terms, art. 10 · 07/01/2026 |
| ELAP | ELAP | Engineering | 0.012 USD/Wp | USD 215,704 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| ELAP | ELAP | Development | 0.018 USD/Wp | USD 323,556 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust formation | fixed fee | USD 35,000 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| Trustee | Fiduciaria Pampa S.A. (example) | Trust administration | 0.8 % of revenue, per year | USD 16,451 | Per year | Contract Trust agreement, annex III · 03/10/2024 |
| EPC | Constructora Huarpe (example) | EPC's declared margin | 10 % of the works in its scope (included in the bill of quantities) | USD 361,462 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| O&M | Operadora Solar Andes (example) | Operation and maintenance | USD 13,500 per MWp per year | USD 242,667 | Per year | Contract Trust agreement, annex III · 03/10/2024 |
| Bank | Banco Regional (example) | Debt structuring | 1 % of the debt | USD 30,645 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| Bank | Banco Regional (example) | Year-1 interest | 8 % a year on the debt | USD 245,158 | Per year | Contract Trust agreement, annex III · 03/10/2024 |
| Independent engineer | Estudio Ingeniería Zonda (example) | Technical review and construction certification | USD 2,500 per MWp | USD 44,938 | Once | Contract Trust agreement, annex III · 03/10/2024 |
| One-off, within CAPEX | USD 1,179,305 | 11.0 % of CAPEX | ||||
| Annual, year 1 | USD 524,840 | from the payment waterfall | ||||
06Production and assumptionsP50 37.39 GWh · P90 35.05 GWh per year · Source: ELAP estimate · ELAP · report as built · P50/P90 study · 05/15/2025
| Data or assumption | Value |
|---|---|
| P50 production | 37.39 GWh per year · 2,080 kWh/kWp |
| P90 production | 35.05 GWh per year · 1,950 kWh/kWp |
| Weather data source | PVGIS-SARAH3 cross-checked with Solcast |
| Years in the series | 2005 to 2022 (18 years) |
| Global horizontal irradiation (GHI) | 1,985 kWh/m² per year |
| Bifacial gain | 7.4 % |
| Total system losses | 14.4 % |
| Soiling | 2.0 % with quarterly cleaning |
| Availability | 99.0 % |
| Grid curtailment | 2.0 % |
| Annual module degradation | 0.4 % per year (manufacturer's linear warranty) |
| Combined uncertainty (1 σ) | 4.9 % · P90 = P50 × (1 − 1.28 σ) |
Actual production versus P50 Source: Actual · CAMMESA · SMEC metering, on the 10th of the following month · 09/2026
| Month | P50 MWh | Actual MWh | Difference | Actual versus P50 |
|---|---|---|---|---|
| 05/2025 | 2,243 | 2,176 | −3.0 % | |
| 06/2025 | 1,944 | 1,983 | +2.0 % | |
| 07/2025 | 2,131 | 2,003 | −6.0 % | |
| 08/2025 | 2,655 | 2,416 | −9.0 % | |
| 09/2025 | 3,066 | 2,943 | −4.0 % | |
| 10/2025 | 3,664 | 3,701 | +1.0 % | |
| 11/2025 | 3,963 | 3,924 | −1.0 % | |
| 12/2025 | 4,150 | 3,943 | −5.0 % | |
| 01/2026 | 4,038 | 4,159 | +3.0 % | |
| 02/2026 | 3,515 | 3,515 | 0.0 % | |
| 03/2026 | 3,365 | 3,500 | +4.0 % | |
| 04/2026 | 2,655 | 2,602 | −2.0 % | |
| 05/2026 | 2,243 | 2,288 | +2.0 % | |
| 06/2026 | 1,944 | 1,925 | −1.0 % | |
| 07/2026 | 2,131 | 2,259 | +6.0 % | |
| 08/2026 | 2,655 | 2,681 | +1.0 % | |
| 09/2026 | 3,066 | 2,974 | −3.0 % | |
| Total | 49,428 | 48,992 | −0.9 % | 17 months in operation |
The grey bar is the month's P50; the black one, the metered output.
Distributed versus projected annualized, % of contributed capital · Source: Actual · Trust settlement statement · on the payment date
| Period | Paid | Distributed | Projected P50 | Difference |
|---|---|---|---|---|
| partial 05-06/2025 | 07/15/2025 | 6.7 % | 11.0 % | −4.3 pp |
| Q3 2025 | 10/15/2025 | 10.2 % | 11.0 % | −0.8 pp |
| Q4 2025 | 01/15/2026 | 9.3 % | 11.0 % | −1.7 pp |
| Q1 2026 | 04/15/2026 | 9.6 % | 11.0 % | −1.4 pp |
| Q2 2026 | 07/15/2026 | 11.4 % | 11.0 % | +0.4 pp |
| Q3 2026 | 10/15/2026 | 10.6 % | 11.0 % | −0.4 pp |
07Revenue15-year MATER PPA
| Item | Value | Source |
|---|---|---|
| Price | USD 55/MWh | Contract Signed MATER PPA · 12/12/2023 |
| Term | 15 years from 05/2025 | Contract Signed MATER PPA · 12/12/2023 |
| Indexation | No indexation: fixed price in USD | Contract Signed MATER PPA · 12/12/2023 |
| Counterparty | Cement plant, Las Heras · MATER Large User | Contract Signed MATER PPA · 12/12/2023 |
| Guarantees | Letter of credit for 3 months of billing | Contract Signed MATER PPA · 12/12/2023 |
| Energy covered | 100 % of the energy | Contract Signed MATER PPA · 12/12/2023 |
| After the contract | Spot, USD 45/MWh as an example | ELAP estimate ELAP · report as built · 05/15/2025 |
08Payment waterfallyear 1 · projected
| Order | Item | Basis | USD year 1, P50 | % of revenue | USD year 1, P90 | Source |
|---|---|---|---|---|---|---|
| Energy sales revenue | 37.39 GWh × USD 55/MWh | USD 2,056,381 | 100.0 % | USD 1,927,857 | Contract Signed MATER PPA · 12/12/2023 | |
| 1 | Operation and maintenance | USD 13,500 per MWp per year | −USD 242,667 | 11.8 % | −USD 242,667 | Contract Trust agreement, annex III · 03/10/2024 |
| 2 | Operational all-risk insurance | 0.3 % of CAPEX per year | −USD 32,146 | 1.6 % | −USD 32,146 | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
| 3 | Trustee fee | 0.8 % of revenue | −USD 16,451 | 0.8 % | −USD 15,423 | Contract Trust agreement, annex III · 03/10/2024 |
| 4 | Platform administration fee | 1 % of revenue | −USD 20,564 | 1.0 % | −USD 19,279 | Contract Platform terms, art. 10 · 07/01/2026 |
| 5 | Municipal fees and gross receipts tax | 1.2 % of revenue | −USD 24,677 | 1.2 % | −USD 23,134 | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
| 6 | Income tax | 35 % of profit, with 25-year depreciation | −USD 366,136 | 17.8 % | −USD 322,502 | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
| 7 | Debt service (principal and interest) | USD 3.06 M at 8 % over 10 years | −USD 456,698 | 22.2 % | −USD 456,698 | Contract Trust agreement, annex III · 03/10/2024 |
| 8 | Inverter replacement reserve | USD 3,000 per MWp per year | −USD 53,926 | 2.6 % | −USD 53,926 | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
| 9 | Distribution to investors | 11.0 % of contributed capital | USD 843,117 | 41.0 % | USD 762,083 | ELAP estimate ELAP · trust model, report as built · 05/15/2025 |
First operation, taxes and debt; then reserves; and only after that the investors. The return on the sheet is the last line divided by the contributed capital (USD 7,650,920).
09Sensitivityyear 1 · same model as the payment waterfall · Source: ELAP estimate · ELAP · trust model, report as built · 05/15/2025
| Case | Year-1 return | Versus base | Distribution USD | Per USD 1,000 |
|---|---|---|---|---|
| Base case (P50) | 11.0 % | — | USD 843,117 | USD 110 |
| Sale price −10 % | 9.3 % | −1.7 pp | USD 713,462 | USD 93 |
| P90 production | 10.0 % | −1.1 pp | USD 762,083 | USD 100 |
| CAPEX +10 %, with more debt | 9.5 % | −1.5 pp | USD 726,341 | USD 95 |
| 20 % exchange-rate gap | 9.2 % | −1.8 pp | USD 702,597 | USD 92 |
CAPEX +10 %: the overrun is financed with more debt. Exchange-rate gap: revenue is collected in pesos at the official rate and the investor converts to dollars at a rate 20 % higher.
10Construction progress100 % actual versus 100 % planned · Source: Actual · Progress certificates · Estudio Ingeniería Zonda (example) · 04/30/2025
| Milestone | Planned | Actual | Delay |
|---|---|---|---|
| EPC signing and advance | 04/15/2024 | 04/15/2024 | on time |
| Modules delivered to site | 06/15/2024 | 06/21/2024 | 6 days |
| Pile driving | 07/15/2024 | 07/19/2024 | 4 days |
| Mechanical installation | 08/15/2024 | 08/27/2024 | 12 days |
| Electrical installation | 09/15/2024 | 10/03/2024 | 18 days |
| MV station and line | 10/15/2024 | 11/06/2024 | 22 days |
| Energization | 11/15/2024 | 11/30/2024 | 15 days |
| CAMMESA commercial operation | 12/15/2024 | 12/31/2024 | 16 days |
| Main equipment | Of 8 |
|---|---|
| Awarded or later | 8 |
| Purchased | 8 |
| Delivered to site | 8 |
| Installed | 8 |
| Month | Planned | Actual | Curve |
|---|---|---|---|
| 04/2024 | 0 % | 0 % | |
| 05/2024 | 2 % | 1 % | |
| 06/2024 | 7 % | 5 % | |
| 07/2024 | 16 % | 13 % | |
| 08/2024 | 26 % | 23 % | |
| 09/2024 | 38 % | 34 % | |
| 10/2024 | 50 % | 46 % | |
| 11/2024 | 62 % | 59 % | |
| 12/2024 | 74 % | 71 % | |
| 01/2025 | 84 % | 81 % | |
| 02/2025 | 93 % | 90 % | |
| 03/2025 | 98 % | 97 % | |
| 04/2025 | 100 % | 100 % |
Purchase status of each item in section 1. Actual dates and progress: independent engineer's certificates.
11Change logpublic to everyone
| Date | What changed | From | To | Why | Source |
|---|---|---|---|---|---|
| 04/30/2025 | CAPEX: source | Contract | Actual, per invoices | Construction close: every line moves to paid invoice. | Actual Construction accounting close · 04/30/2025 |
| 05/15/2025 | ELAP report | rev C | as built | Final survey of the built plant. | ELAP estimate ELAP · report as built · 05/15/2025 |
| 04/15/2026 | Year-1 degradation | 0.40 % (warranty) | 0.35 % (measured) | Measurement of the first full year of operation. | Actual Annual operation report 2025 · 04/15/2026 |
When a figure changes source (estimated, quoted, contracted, actual), the previous one stays here.
12Documentsdata room
- Trust agreementPDF · 03/2024Registered users only
- ProspectusPDF · 01/2024View
- Power purchase agreementPDF · 12/2023Registered users only
- ELAP engineering report, as builtPDF · 05/2025View
- Grid access studyPDF · 06/2023View
- Independent engineer's technical auditPDF · 06/2025 · final acceptanceRegistered users only
- Quarterly financial statements of the trustPDF · 10/2026 · Q3 2026Registered users only
- Quarterly operation report, Q3 2026PDF · 10/2026Registered users only
- Trust annual financial statement 2025PDF · 04/2026Registered users only